Hydro excavation cuts the soil with water and sucks the mud up a hose, so what is buried comes up whole and visible. Digging near a power cable, a gas pipe, a fibre line or a tree you want to keep is exactly when to use it. We pull the plans, locate, pothole and cart the slurry away.
For homeowners, builders, civil crews, network contractors and councils across Whangarei and Northland, with our own hydro excavation unit and 5 tonne vacuum trucks. A real person answers 24/7.
Get help with hydro excavation

Master Plumbers Member

Site Safe Member

Certifying Plumber, Gasfitter and Drainlayer
Google Rated 4.9
Get help with hydro excavation
Overview & Answer
What is hydro excavation?
Hydro excavation is digging with water instead of a bucket. A lance of pressurised water breaks up the soil, and a strong vacuum hose lifts the mud into a sealed tank on a truck. Because nothing sharp touches the ground, pipes and cables come up undamaged, which is why network owners accept it for potholing.
Hit a cable or pipe? Do this first
Power cable struck
Treat it as live. Stay in the machine unless there is a fire, and if you must get out, jump clear so you never touch the machine and the ground together. Keep everyone at least 10 metres back, ring 111 if anyone has had a shock, then Northpower faults on 0800 10 40 40.
Gas pipe damaged or you smell gas
Switch machines off, keep anything that can spark away and move people upwind. Ring 111 if anyone is in danger, then Firstgas on 0800 802 332. Never bury the pipe, push a bucket over it or try a repair.
Fibre or phone cable cut
Do not look into the cut end, because the laser light inside can damage your eyes. Leave it uncovered and report it to the owner named on your beforeUdig plans. Damage to Northpower's own fibre goes to the same faults line as power.
Water main or sewer broken
Keep clear of the water and away from any sewage. Damage to a council main goes to Whangarei District Council's 24 hour line on 09 430 4200.
Even a scratch gets reported
A nicked pipe coating or cable sheath can fail months later. Tell the owner straight away, leave it exposed and let them decide on the repair.
Scope & Inclusions
- Potholing to find and prove buried services
- Exposing power, gas, fibre and water lines
- Slot trenches for new cables and pipes
- Digging around tree roots
- Post, pile and pole holes near services
- Uncovering leaking or broken pipes
Need a different job?
Sump, pit or tank full of liquid to suck out?
Vacuum LoadingBig trench, house pad or site cut to dig?
ExcavationWater meter spinning with no tap on?
Leak DetectionPipe found broken once it is dug out?
Drain Repairs
Suitability & Limits
Times a digger or a spade is the wrong tool
If something you cannot afford to break might be in the way, start with water.
Plans show a service near your dig
The beforeUdig map puts a power cable, gas main or fibre duct across the line of your trench, fence or footing.
You need to see it, not guess
A designer, the network owner or a contractor wants the depth and position of a pipe or cable proven before work starts.
A tree you want to keep
The trench or footing runs inside the canopy of a tree whose roots you cannot afford to slice through.
No room for a machine
A backyard behind the house, a narrow side path or a berm full of services where a digger cannot fit or should not swing.
Digs & Excavation
Jobs we do with water and suction
Most hydro digs are one of these. Tell us which services are nearby.
Potholes and test holes
Small, neat holes over a marked service to show exactly how deep it sits and which way it runs, measured and photographed before a machine arrives.
Slot trenches
Narrow trenches for new power, fibre, irrigation or water lines through ground already crowded with other services.
Exposing pipes for repair
Uncovering a leaking water pipe, cracked drain or damaged duct so the plumber or network crew can get straight to it.
Holes for posts, piles and poles
Fence posts, deck piles, signs and pole footings near buried lines, dug clean to the size the engineer or builder wants.
Around tree roots
Soil washed out from between the roots so they stay whole, for an arborist to decide which, if any, can be cut.
Entry pits for boring
Launch and catch pits for thrusting or directional drilling under driveways and roads, dug where every other service is already showing.
Proof & Promise
Why book Taylor for hydro excavation?
One call, our own unit and operator
You ring us. We send our own hydro excavation unit and a trained operator, and run the dig from plans to backfill.
Plans, locate, then pothole
Before any machine digs, we have the beforeUdig plans, sweep the site with a locator and prove each service by eye.
Slurry to a site that takes it
The mud goes in a sealed tank and leaves your property for a disposal site that accepts it. You get the docket.
Operators trained for the job
Our operators work to each network owner's close approach rules, and our crews are confined space trained and NZ Police vetted.
Certifying drainlayer and plumber
The pipe we expose is fixed by the same team, signed off by our in house certifying drainlayer and backfilled. Master Plumbers and Site Safe members.
24/7 for emergency digs
Burst mains and blocked sewers next to live cables cannot wait for Monday. Ring any time and a person answers, with the after hours rate up front.
Networks & Utilities
Power, gas and fibre each have their own rules
Northpower owns the power cables around Whangarei and wants a cable locate booked for any work within 10 metres of them, with two working days notice. Locates on a private home are free. Its rules keep mechanical diggers at least one metre from its strategic cables, ask for no toothed buckets near its gear, and need a Northpower standover within two metres of high voltage cables. Its cables can sit just under the turf or deeper than 1.2 metres, sometimes with no warning tape above them.
Firstgas wants every gas pipe found by potholing with hand tools or hydrovac before a machine goes near, and says not to trust a depth on the plan. Bigger distribution pipes running above 420 kPa need its Close Approach Consent, and any work near a transmission pipeline needs an easement permit first.
Fibre is the cable people forget. A digger cut a fibre line at a Whangarei intersection in 2018 and about 1,500 homes and businesses lost broadband for hours. In January 2025 a digger pulled up a main fibre cable in Kaipara, and over 2,070 customers around Dargaville lost their internet.
Safety & Guidance
Assume it is there until you have seen it
WorkSafe's excavation guidelines tell anyone digging to consider services present until it is proven they are not. They say to talk to the service owner before work starts, trace and mark every line, use more than one type of detector, and pothole to confirm the real depth, because ground levels change and drawings drift from what was actually laid.
The guidelines also expect a plan for what happens if a service is hit. A beforeUdig map only shows that a service is there, not exactly where. A deep pothole counts as notifiable work too: if a person works in a hole over 1.5 metres deep that is deeper than it is wide at the top, the business doing it gives WorkSafe 24 hours notice.
Slurry & Disposal
Where the mud goes
Every hydro dig makes slurry, a soup of soil and water. Northland Regional Council says stormwater drains are for rain only, are never treated, and that dirt and soil smother streams and riverbeds. So slurry never gets hosed into the gutter or tipped down the nearest grate.
If a load is taken to a council treatment plant, Whangarei District Council's Trade Waste Bylaw 2023 says only an operator with a trade waste consent can tip it, at a spot the council approves. Most slurry is soil, though, so it usually goes to a site set up to settle out the water and take the dirt.
Trees & Roots
Digging under a tree you want to keep
Water washes soil out from between the roots and leaves the roots themselves alone, so an arborist can look at them before anything is cut.
Check the rules first. Whangarei District Council needs a land use consent for any work on, or within the drip line of, a notable tree in the District Plan. Street and park trees taller than 6 metres, or more than 600 mm round at 1.4 metres off the ground, are protected too, and any work on a tree in a road reserve needs the council's Parks and Recreation team to say yes.
Access & Equipment
Backyards, berms and side paths
The truck stays on the street or the drive and the hose does the walking, over fences, along side paths and under decks.
Digging in a berm, footpath or road in Whangarei needs a council Work Access Permit, applied for at least 15 working days before the work. Only true emergencies under the national code can start without one. We lodge the permit early so the dig day is not held up.
Process & Steps
Booking a hydro dig
01
Tell us the job
The address, what you are digging for, how deep and how far, and any plans or photos you already have.
02
Plans and locates
We lodge beforeUdig, book the network owner's locate or standover where its rules call for one, mark the services and sort any permit.
03
Dig with water
The operator sets up cones, digs the potholes or trench, and records each service with depth and photos as it shows.
04
Slurry out, ground back
The tank goes to the disposal site, you get the docket and the photos, and the holes are backfilled or left open for the next trade.
Costs & Quotes
What hydro excavation costs
A handful of potholes on a quiet section and a day of slot trenching beside a state highway are not the same job. Send us the plans and photos and you get a price with GST included before anything is booked.
What moves the price: how many holes or metres, the depth, the soil, how far the hose has to reach, slurry loads and disposal, standover or locate charges set by the network owner, permits and traffic management, travel and after hours work.
Small jobs are often charged by the hour on site with a set number of loads. If we expose a broken pipe while we are digging, we price the repair and wait for your yes.
Request a quoteWhangarei & Northland
Where we dig
We dig across Whangarei, from the city streets, Kamo, Tikipunga, Maunu and Onerahi to the port and Raumanga, and south to Ruakaka, Marsden Point and Waipu.
Based in Whangarei, we dig from Hikurangi and Maungatapere to every part of Northland, Kaitaia and the Bay of Islands down to Dargaville and Mangawhai, with travel outside the district quoted first. The network owner changes as you go north, so we work to whichever rules apply at your address.
beforeUdig plan requestsClients & Sectors
Homeowners, builders, civil crews and networks
Homeowners
Fences, decks, sleepouts and garden projects near the power and fibre running into the house.
Builders and landscapers
Piles, footings and retaining walls proven clear of services before the auger or digger arrives.
Civil and network contractors
Potholing ahead of drilling and trenching crews, with depth records your engineer can use.
Councils and businesses
Work in busy roads, car parks and industrial sites where a strike would stop the whole street.
Related & Similar
Related civil and drainage services
These jobs often come before or after a hydro dig.
Excavation
Trenches, pads and site cuts.
Vacuum Loading
Sucker truck for pits and liquid waste.
Gas Lines
New and replacement gas pipework.
Drain Repairs
Broken and collapsed drains fixed.
Questions & Answers
Hydro excavation questions
How much does hydro excavation cost in Whangarei?
You get a price with GST before booking, set by the number of holes or metres of trench, the depth, the soil, the hose distance and how many loads of slurry go to disposal. Locate charges, permits and traffic control can add to it. Send us the plans and a few photos to get it.
Is vacuum excavation the same as hydro excavation?
Not quite. Hydro excavation is one kind of it. Vacuum excavation is the umbrella name for any digging where suction lifts the spoil. Hydro excavation, or hydrovac, uses water to loosen the ground first, and air excavation uses compressed air. Non destructive digging covers all of them.
What is potholing?
A pothole is a small inspection hole dug straight down onto a marked service to see it with your own eyes. It proves the depth and direction before the main dig starts, and often turns up side connections that were never on the plans. WorkSafe's guidelines expect it wherever services may be present.
Do I need a beforeUdig request for a small job at home?
Yes. A request is free and needs at least two full business days before you dig, even for fence posts. The plans often leave out pipes and cables you own inside your boundary, such as the power to a shed, so a locator sweep is worth doing as well.
Will the network owner come and mark their cable?
Yes, with notice. Northpower locates its cables for work within 10 metres, with two working days notice, and there is no charge on a private home. Firstgas marks its high pressure pipelines for free with notice. Elsewhere we locate with our own gear and pothole to prove what we find.
Can the water jet damage a pipe or cable?
Not in trained hands, which is why the operator matters. Near a service the pressure is turned down, the lance is kept moving and the last of the soil is lifted off gently. Old cable sheaths, fibre ducts and brittle pipes get extra care, and any nick is reported.
Does hydro excavation work in clay and rock?
Clay is fine, just slower than sand or loam, and it makes a thick slurry. Solid rock and big boulders will not budge with water, so we tell you early if part of the dig needs a breaker or a different method.
What happens to the mud and water?
It stays sealed in the tank on the truck until it reaches a site that accepts slurry, where the water is settled out from the soil. None of it goes into a gutter, stormwater grate or paddock. You get a docket showing where each load ended up.
Can you dig near tree roots without killing the tree?
Yes, that is one of the best uses for it. Water clears the soil and leaves the roots whole, so an arborist can choose what stays. If the tree is a notable tree or a protected street tree in Whangarei, you need council approval before working inside its drip line.
Do I need a permit to dig in the berm or footpath?
Yes. Any digging in a Whangarei road, footpath or berm needs a council Work Access Permit before work starts, and the council asks for the application at least 15 working days ahead. Traffic management may be needed too, and we lodge the permit as part of the job.
Is hydro excavation safer than digging by hand?
Yes. Spades, crowbars and picks still puncture pipes and cut cables. Water does not have an edge. Northpower and Firstgas both accept hydrovac in place of hand digging for potholing.
Can you reach a backyard or a spot under a deck?
Yes. The truck parks on the road or drive and the hose is run through to the dig, so nothing heavy crosses the lawn. Tell us how far it is from the street and send a photo, and we confirm the hose will reach before we book.
What is the difference between this and vacuum loading?
A hydro dig is about making a hole safely around things you must not break. Vacuum loading empties a pit, sump or tank of muck and water that is already there. The trucks look alike, and both jobs can be booked through us, but the crew, the gear set up and the price differ.
Can you come out after hours for an emergency dig?
Yes. When a main has burst or a sewer has collapsed among live services, we answer around the clock and tell you the after hours rate before anyone heads out. If a cable or gas pipe has already been hit, follow the steps in the safety box first.
Will you backfill and tidy up afterwards?
Yes. Holes are filled and compacted in layers, with clean, stone free material around any cable and the warning tape put back where the network owner asks for it.