Taylor Plumbing Whangarei logo

Renovations & Builds

Bathroom Renovation Plumber in Whangarei

From a tired 1970s bathroom in Kamo to a new ensuite in Onerahi, we strip it out, plumb it, waterproof it and fit it off, with the tiler, electrician and builder lined up in the right order. Want only the plumbing for your own builder? We do that too.

An in house certifying plumber, 35 years in the trade, a written price before we start, and the Master Plumbers Guarantee on home workmanship: 12 months, up to $20,000 including GST.

  • Master Plumbers member logo

    Master Plumbers Member

  • Site Safe member logo

    Site Safe Member

  • Certifying Plumber, Certifying Gasfitter and Certifying Drainlayer

    Certifying Plumber, Gasfitter and Drainlayer

  • Google logo

    Google Rated 4.9

Get help with bathroom plumbing

Forms are picked up 24/7, nights and weekends too. Urgent? Call 09 885 5973.

We'll use your details to respond to your enquiry. Marketing messages are optional. Privacy Policy

Overview & Answer

What does a plumber do in a bathroom renovation?

The plumber caps the old pipes at strip out, then runs new hot, cold and waste lines to suit your layout before the walls close. Everything is pressure tested, the waterproofer seals around it, the tiler finishes, and the plumber comes back to fit the toilet, vanity, shower and taps and sign off the work.

We can run that whole sequence ourselves or slot into your builder's programme. Either way, the plumbing has to be done or supervised by an authorised plumber, even on exempt work.

Scope & Inclusions

  • Full bathroom strip out and rebuild
  • Plumbing only rough in and fit off
  • Showers, baths, vanities and toilets
  • Level entry and wet floor showers
  • Waterproofing to E3
  • Moving or adding fixtures
  • Old pipe replacement behind the walls
  • Consent, inspections and sign off paperwork

Need something smaller?

Jobs & Options

Four ways a bathroom job runs with us

Tell us which one sounds like yours and we will price it that way.

  • We run the whole renovation

    One contact from the first measure to the last silicone bead. We book the builder, waterproofer, tiler and electrician, keep them in order and answer for the lot.

  • Plumbing only for your builder

    Your builder or project manager runs the job and we do the rough in, pressure tests and fit off to their programme and the fixture schedule.

  • Same layout, new fittings

    New vanity, toilet suite, shower and taps in the spots the old ones sat. Least pipe work, least mess and often no consent.

  • Accessible or step free

    Level entry floor, wider door, grab rail backing and a comfort height toilet, planned around the person using the room.

Checks & Choices

What we check on the first visit

Pretty fittings are the easy part. What decides the price and the layout is underneath, so we look at this first:

  • Timber floor or concrete slab, and where the joists run
  • Where the waste can go and how much fall it gets
  • Pipe age and type: copper, galvanised, Dux Qest grey or modern PEX
  • Hot water: cylinder size, mains or low pressure, gas or electric
  • Soft floor, rot or stains that say the old shower has been leaking
  • Linings and vinyl that could hold asbestos in a pre 2000 home
  • Tank, bore or septic, and whether the system copes with more fixtures
  • How the fan will vent outside

Where it helps, we lift a tile or take a moisture reading before quoting, so the price reflects what is really behind the wall.

Showers & Access

Getting rid of the shower step

A true level entry shower has no tray and no hob. The floor itself falls to a waste, so on timber the joists are often dropped or notched and on a slab the concrete is cut and lowered. MBIE's view is that installing a wet area shower needs a building consent, and once structure changes there is no argument.

The membrane covers the whole wet zone, the floor waste is set before the membrane goes down, and the fall is formed by the builder. In a house the room can be designed around the person using it, because the accessible design standard is not required for homes.

Trades & Sequence

Who goes in when

Strip out, framing fixes, plumbing rough in and pressure test, electrical rough in, linings, membrane, flood test, tiles, then fit off. Get that order wrong and somebody drills through a membrane or tiles over a pipe that was never tested.

Under E3/AS2 the membrane goes on to the waterproofing industry's code of practice, and where there is a consent the council looks at it before the tiles go on. We put a date against each stage and keep the trades to it.

Consent & Compliance

Exempt or consented: who makes the call

In the Whangarei district the owner decides whether work is exempt, and WDC can grant a discretionary exemption only before work starts. Guess wrong and the fix is a certificate of acceptance, which means proving the work complies after it has been tiled over.

Relining an old tiled shower has been ruled exempt too: Determination 2024/054 found a new membrane and tiles in an existing house fell under the linings exemption. In an apartment, moving a fixture can mean a new hole through a fire wall, and that needs consent. We check your plan against all of this before you commit.

Records & Certificates

Records you get when it is done

On a consented job WDC wants proof before it issues the code compliance certificate. That means our producer statement for the water and air tests on the pipes, a wet area producer statement for the membrane, and a record of work from any licensed building practitioner who changed the structure.

Exempt work still gets the test results, product details and warranty registrations in writing. Keep them with the house papers, because buyers and insurers ask.

Floors & Rails

Heated towel rails and underfloor heating

A towel rail on a hot water or heating loop is plumbing, and so is a water underfloor system. Electric rails and electric mats under tiles need a registered electrician, and ours is in house, on the same programme so the wiring is in before the linings go up.

Decide on warm floors before the floor is prepped, because the mat or pipe sits under the tiles and the controls need a spot on the wall.

Asbestos & Age

Asbestos in old bathrooms

WorkSafe says any home built before 2000 can have asbestos, and bathrooms are a usual spot: wet area sheet linings, tile backing boards and old vinyl. You can't tell by looking. Suspect material gets tested before strip out, and if it is positive a licensed removalist takes it out first.

Proof & Promise

Why use Taylor for your bathroom?

  • Every trade signed off in house

    Our plumbers do the restricted work, our in house certifying plumber, drainlayer and gasfitter sign it off, and we are Master Plumbers members.

  • One contact for every trade

    Builder, waterproofer, tiler and electrician booked and run by us, so nobody blames the trade before them.

  • A fixed written price

    The quote lists what stays, what goes, who supplies what, the allowances and GST. Nothing extra happens without your yes in writing.

  • We look under the tiles first

    Moisture readings and a lifted tile where needed, so rot and old pipe show up in the price rather than halfway through.

  • Paperwork that gets you the certificate

    Producer statements, test results and records lodged with WDC, plus a folder for you with warranties and product details.

  • Guaranteed workmanship, help 24/7

    Home workmanship carries the Master Plumbers Guarantee, 12 months and up to $20,000 including GST, and if a pipe lets go after hours a person answers any time. A lifetime guarantee sits on our plumbing labour, with the maker's warranty on parts.

Process & Steps

From first measure to the last tap

  1. 01

    Measure and look

    We visit, check the floor, pipes, hot water and drainage, and talk through the layout, fixtures and how you will manage without the room.

  2. 02

    Price and paperwork

    Written quote and programme, consent lodged where it is needed, and fixtures ordered so nothing holds up the trades.

  3. 03

    Strip out and rough in

    Old fittings out, pipes capped, new pipes and wastes run and pressure tested, then the membrane is flood tested before tiles.

  4. 04

    Fit off and hand over

    Fixtures connected and checked for leaks, flow, drainage and hot water temperature, then the records and warranties go to you.

Costs & Quotes

What a bathroom renovation costs

Every bathroom is priced from a site visit, because the same size room can be a straight swap or a full rebuild with a new floor. You get one written price that splits the plumbing, building, waterproofing, tiling and electrical, so you can see where the money goes.

What moves the price most: moving the toilet or shower, a slab floor, a level entry shower, rot or old pipe found at strip out, asbestos testing, the fixtures you pick, consent fees and travel.

Comparing quotes? Check each one says whether GST is in, who supplies the fittings and what happens if rot turns up.

Residential building work of $30,000 or more including GST needs a written contract, and the contractor must hand over a disclosure statement and checklist before you sign. Faults in the work must be fixed if you report them within 12 months of completion.

Request a quote

Whangarei & Northland

Bathrooms from Kamo to the coast

Plenty of the bathrooms we strip out in Whangarei date from the 1960s to the 80s, with timber floors over a crawl space, galvanised or early plastic pipes and a low pressure cylinder in the hall cupboard. Those floors make level entry showers easier than on a slab, and most of those houses need the hot water looked at before a modern mixer goes in.

Building consent for the Whangarei district goes to WDC on 09 430 4200; Far North and Kaipara homes deal with their own council. Some town streets run high pressure, so new mixers get a limiting valve where needed.

We cover Whangarei and its suburbs, out to the Heads, Tutukaka, Ruakaka and Waipu. From Whangarei we cover the whole of Northland: Kaitaia, Kerikeri, the Bay of Islands, Dargaville and Mangawhai.

WDC building consent exemptions

Customers & Properties

Homeowners, builders, landlords and shared buildings

  • Homeowners

    Whether it is the only bathroom or a second ensuite, we plan the order so the toilet is out of action for as little time as possible.

  • Builders and designers

    Rough in to your plans and fixture schedule, tests recorded, and fit off booked when the tiler is done.

  • Landlords

    A Healthy Homes compliant fan goes in as part of the reno, and we arrange access with your tenants or property manager.

  • Units and body corporates

    Shared stacks, risers and fire walls are agreed with the body corporate before we cut anything.

Related & Similar

Related bathroom and home services

Bathroom work often turns up a second job. These pages cover it.

View all plumbing services

Questions & Answers

Bathroom renovation questions

How much does a bathroom renovation plumber cost in Whangarei?

We price after a site visit, in writing, with GST shown and the plumbing split from the other trades. Keeping the toilet, vanity and shower where they are is the cheapest plumbing; shifting the toilet means new drainage and costs the most.

Do I need building consent to renovate a bathroom?

Not for most like for like jobs. Replacing fixtures, moving them around the same room and relining a tiled shower are usually exempt when an authorised plumber does the plumbing. Adding a fixture, changing the floor structure or building a level entry wet floor normally needs consent. Exempt work still has to meet the Building Code.

Can you move a toilet in a bathroom renovation?

Usually, yes. A toilet needs a big waste pipe with enough fall back to the drain, so on a timber floor it is mostly about which way the joists run. On a slab we cut a trench in the concrete. A macerator pump is a last resort where gravity won't work.

Can a small bathroom have a walk in shower?

Often it can, and losing the bath or the tray can make a small room feel bigger. The catch is splash: without a hob the whole floor near the shower must be waterproofed and fall to the waste. A frameless screen and a linear drain along the wall help in tight rooms.

Can my builder do the plumbing?

Only if they hold a plumbing authorisation. The Plumbers, Gasfitters and Drainlayers Board limits fixing or unfixing pipes, fixtures, traps and wastes to authorised people, and exempt work must still be done or supervised by one. Your builder can strip out and frame; the pipework is ours.

Can I buy my own vanity, toilet and tapware?

Yes, we fit fixtures you supply. If you buy, send us the model numbers before you pay, because some mixers only suit mains pressure, some toilets need a set distance to the waste, and some vanities come without a trap or connectors. Agree up front who handles a damaged or wrong delivery.

How long does a bathroom renovation take?

Your quote tells you, in a written programme showing each stage and the days the room is out of use. A same layout refresh is far quicker than a rebuild with a new floor, and the membrane has to cure before the tiler starts.

Who does the waterproofing in a bathroom renovation?

A trained applicator we book and manage, as part of the job. The membrane goes on to the supplier's system after our pipes are in and tested, then it is flood tested before the tiler starts. On a consented job you get the wet area producer statement for the council.

Is a level entry shower worth it?

For anyone with a walker, a wheelchair or unsteady feet, yes. It also suits growing old in the same house. If Disability Support Services might pay for it, get its assessment and approval first, because work done before approval is generally not funded.

Should I replace old pipes while the walls are open?

In most older homes, yes. Galvanised steel isn't on MBIE's list of accepted water pipe, and Dux Qest grey plastic from the late 1970s was withdrawn after a run of failures. Replacing what sits behind new tiles costs little now compared with cutting them out later.

Will my hot water cylinder cope with a new bathroom?

Not always. A big rain head, a second shower or a deep bath can empty a small cylinder fast, and MBIE puts a family of four at 180 litres or more. New showers must also deliver no hotter than 50°C, so we fit a tempering valve or a thermostatic mixer where one is missing.

Can you add an ensuite or second bathroom?

Yes. Adding toilets, basins or showers needs a building consent, and we check three things first: a drain route with fall, enough hot water, and on rural sections whether the septic system can take the extra load. We plan the plumbing, lodge the consent and run the build.

Can you install a heated towel rail?

Yes. A heated towel rail on your hot water or heating loop is plumbed in by us. An electric rail needs a registered electrician for the wiring, and our in house electrician does it on the same job so the cable is in the wall before it is lined.

Does a rental bathroom need an extractor fan?

Yes, under the Healthy Homes ventilation rules every room with a bath or shower needs a fan that vents outside. Fans fitted since July 2019 must be at least 120 mm across or move 25 litres a second. An older fan can stay while it works and vents outside.

Can I keep using my bathroom during the renovation?

Not for the whole job. In a one bathroom house we get the toilet working again as early as the work allows and tell you before the start which days you will need another option for showers. Plan those days with family, a neighbour or the gym.

Planning a bathroom in Whangarei?

Send us photos of the room and the hot water cylinder, and tell us what you want changed. We will book a site visit and come back with a written price.

Get help with bathroom plumbing

Forms are picked up 24/7, nights and weekends too. Urgent? Call 09 885 5973.

We'll use your details to respond to your enquiry. Marketing messages are optional. Privacy Policy

Get my quoteGet a quote