Taylor Plumbing Whangarei logo

Stormwater & Subsoil

Stormwater Detention Tanks in Whangarei

Taylor Plumbing puts in detention tanks, retention tanks and combined reuse and detention tanks across Whangarei and Northland, built to the engineer's design and signed off with the council by our in house certifying drainlayer. Council conditions asking for stormwater detention on your new house, extra unit or subdivision are what these tanks answer. We fix existing tanks too, 24/7 when one spills in a storm.

  • Master Plumbers member logo

    Master Plumbers Member

  • Site Safe member logo

    Site Safe Member

  • Certifying Plumber, Certifying Gasfitter and Certifying Drainlayer

    Certifying Plumber, Gasfitter and Drainlayer

  • Google logo

    Google Rated 4.9

Get help with stormwater detention tanks

Forms are picked up 24/7, nights and weekends too. Urgent? Call 09 885 5973.

We'll use your details to respond to your enquiry. Marketing messages are optional. Privacy Policy

Overview & Answer

When do you need a stormwater detention tank in Whangarei?

When new roofs and paving would push more stormwater off your section than the bare land did, and the ground cannot soak it up. Whangarei's engineering standards cap a developed site's peak flow at 80 percent of the old peak. A detention tank catches the storm and lets it out slowly through a small outlet.

For simple jobs the council publishes a sizing chart, and a job that fits it needs no engineer. We tell you which route applies before you spend on design.

Tank spilling toward the house? Do this first

  1. Look, never climb in

    The inside of a stormwater tank is a confined space, for trained crews only. Check it from the lid, and keep kids and pets well back from an open riser.

  2. Turn the water

    Sandbags or boards will steer the overflow away from walls and the subfloor. Keep it off the neighbour's section, stay out of moving floodwater and ring 111 if anyone is in danger.

  3. Street drains flooding?

    When the council's own pipes are overflowing, Whangarei District Council's urgent stormwater number, 0800 932 463, is staffed day and night.

Call 09 885 5973

Scope & Inclusions

  • Detention tanks for new houses and extensions
  • Retention tanks for reuse
  • Combined reuse and detention tanks
  • Underground, slimline and modular tanks
  • Orifice outlets, screens and overflows
  • As built plans and council inspections

Is a detention tank the right fix?

Triggers & Timing

Signs your detention tank needs a look

Lift the lid a day after decent rain, without leaning in.

  • Still brimming next day

    A detention tank should drain right down between storms. One still full after a dry day has a blocked orifice or outlet, so the next storm goes straight over the top.

  • Overflow running in a shower

    An overflow pipe flowing in light rain means the tank has lost its spare room, usually to silt or a clogged screen.

  • Bone dry in a downpour

    No water in heavy rain points to a cracked inlet, a downpipe running elsewhere or a missing orifice plate, so nothing is being held back.

  • Muck in the leaf guard

    Grit and leaves piling up at the inlet are settling in the tank too, and heading for the orifice.

  • Ground sinking over a buried tank

    Soft lawn above an underground tank can mean a cracked shell, a leaking joint or a pulled inlet.

  • Bought a place with one

    A tank required by a consent is often recorded on the title or LIM, and the upkeep comes with the house. Get it checked soon after settlement.

Detention & Tanks

Four ways to hold stormwater back

The design picks the volume. Space on the section and the soil usually pick the tank.

  • Round tanks above ground

    The simplest setup, and the one Whangarei's sizing chart assumes, with the orifice low down so it empties between storms. It needs a level, compacted pad and restraint against wind and earthquakes.

  • Underground tanks

    Buried tanks give you the yard back. They need hold down so groundwater cannot float them, risers to reach the orifice and silt, and on unstable land a sealed tank so stored water stays out of the slope.

  • Slimline and modular tanks

    Narrow tanks along a fence, or modular cells under a deck or paving, suit tight infill sections where a round tank will not fit.

  • Combined reuse and detention

    One tank doing two jobs. The lower part keeps rain for toilets, laundry or the garden, and the upper part stays empty for storms, draining through an orifice set partway up the wall.

Scope & Price

What sets the tank size and the price

The design or the council chart drives most of it. On site we check:

  • New roof, driveway and paving draining to the tank
  • Whether the council chart fits or a specific design is needed
  • Where the outlet can discharge: council pipe, kerb or stream
  • Soil, slope and any stability hazard rating on the land
  • Room for the tank, digger access and what gets reinstated
  • Reuse inside the house, which can shrink the detention share

Every extra square metre of seal adds to the tank, so settle the patio and the carport before the tank is ordered.

Proof & Promise

Why call Taylor about a detention tank?

  • Certifying drainlayer

    Tanks, orifices and outlet pipes are drainlaying, so our in house certifying drainlayer signs off the work, and home jobs carry the Master Plumbers Guarantee: 12 months, up to $20,000 incl GST.

  • Built to the design

    Orifice size and height, overflow, screens and outlet levels go in exactly as drawn, and anything on site that does not match goes back to the engineer before it is buried.

  • Chart sizing for simple jobs

    Where a straightforward house job fits Whangarei's sizing chart, we take you through the numbers. Anything outside it goes to a stormwater engineer.

  • Diggers, vacuum gear and cameras

    Our own diggers for the hole, vacuum gear to pull silt from tanks, and a drain camera for the outlet line. Tank entry is left to crew trained for confined spaces.

  • Storm night call outs

    Ring at 2am about a tank spilling at the house and a person picks up, then a crew gets on the road, 24/7.

  • Paperwork for council

    Inspections booked, an as built plan showing the tank, orifice and overflow, and a written quote with GST before a sod is turned.

Council & Rules

When the council wants stormwater held back

Whangarei's stormwater bylaw lets the council require detention on private land. The Engineering Standards 2022 set the target: peak flows in the 1 in 100 year storm, and in the smaller 1 in 2 and 1 in 5 year storms, held to 80 percent of what the site produced before it was built on, with 20 percent added to rainfall for climate change.

In practice that reaches new houses on bare land, extra units on infill sections and subdivision lots.

There are let outs. Discharge straight into the tidal zone needs no attenuation, and near the bottom of a catchment the council can waive it after an assessment, because holding water back there can worsen flooding.

Hydraulics & Design

Hydraulic neutrality and the orifice

Hydraulic neutrality means a built site sends no more water down the pipe at the height of a storm than it did as grass. Whangarei calls it attenuation: store the surge and let it go slowly.

The orifice does the work. It is a small hole in a plate or cap on the outlet, so rain pours in faster than it can leave and the tank fills, then drains over the following hours. On Whangarei's sizing chart, orifices for house sites run from about 18 to 41 mm, sitting just above 150 mm of dead storage that catches silt.

A screen is required where detention flows into a piped network, plus an overflow for bigger storms. A hole that small chokes on leaves and grit, so getting at it easily matters as much as the tank.

Reuse & Detention

Making one tank do two jobs

Whangarei ranks keeping rain for reuse first, ahead of soaking it away or slowing it down. A tank supplying water to the house earns a cut to the roof part of the detention volume, worked out on each person using 250 litres a day.

The council table shows how far that stretches. A 150 square metre roof feeding a 25,000 litre supply tank halves the roof share, while a 500 square metre roof on a 200 litre tank saves only 5 percent. Driveways get no credit, and past 120 square metres of other hard surface a combined system is required.

On body corporate and commercial sites, the water use the design counts on is written onto the title or land use consent.

Cleaning & Upkeep

Keeping the orifice clear

A detention tank runs itself until the orifice blocks. Check the lid, leaf guard, silt trap, overflow and orifice at least once a year, and Auckland Council's tank guide adds clearing gutters every six months.

Light grit can be hosed off the outlet mesh from above. Heavy silt needs a vacuum truck and a crew trained for confined spaces. Keep a written record of every check, because a council can ask to see it.

Process & Steps

From consent condition to signed off tank

  1. 01

    Send the plans

    Site plan, the engineer's stormwater design or the council conditions, and photos of where the outlet could go.

  2. 02

    Check it on site

    We confirm levels, the discharge point, soil and access, and flag anything the drawings missed.

  3. 03

    Written price

    Tank, orifice, overflow, pipework, digging, reinstatement, consent steps and GST, line by line. Work starts on your yes.

  4. 04

    Install and sign off

    Tank bedded and restrained, orifice fitted to the design, flow tested, inspection booked and an as built plan handed over.

Costs & Quotes

How detention tank work is priced

New tanks are quoted in writing from the design, because the volume, the tank type and the dig make up most of the cost.

Our quote lists the tank and fittings, orifice and screens, overflow and outlet pipe, excavation and cart away, bedding and hold down, reinstatement, any engineer and council fees we arrange, travel and GST.

Servicing or checking an existing tank is a shorter visit, and you hear the charge before we come.

Request a quote

Whangarei & Northland

Detention tanks around Whangarei

We install and service tanks in Kamo, Tikipunga, Maunu, Glenbervie, Raumanga, Onerahi, Otangarei, Parua Bay, Ruakaka and One Tree Point. Our team is Whangarei based and covers every part of Northland, from Kaitaia, Kerikeri and the Bay of Islands to Dargaville and Mangawhai, and travel outside the Whangarei district goes on the quote first.

Mangawhai sits in Kaipara and Kerikeri in the Far North, and both councils run their own engineering standards, which we follow there.

When Northland Waters takes over drinking water and wastewater in July 2027, stormwater stays with Whangarei District Council, so these detention rules are not changing hands.

Whangarei District Council flood management

Customers & Properties

Who calls us about detention tanks

  • Owner builders and new home buyers

    We build to the tank and orifice your consent names and hand over the plan for your code compliance file.

  • Builders and designers

    Bring us in at drawings stage, so the tank, levels and outlet are sorted before the slab goes down.

  • Developers and infill

    Extra units and new lots, each tank built to the engineer's plan.

  • Landlords and body corporates

    Tank checks and silt removal, with what we found set out for owners or the council.

Related & Similar

Related stormwater services

The other ways we deal with rain on a section.

View all drainlaying services

Questions & Answers

Detention tank questions

How much does a detention tank cost in Whangarei?

The volume, the tank type and the dig set the price. We price from the design and list the tank, orifice, pipework, excavation, reinstatement and GST, and nothing extra goes on without your say so.

What is the difference between a detention tank and a retention tank?

A detention tank empties itself, while a retention tank keeps the water. Detention stores storm runoff for a few hours and lets it out slowly through a small outlet. Retention holds rain for you to use on the garden, toilets or laundry. A combined tank does both, with reuse water in the bottom and storm space above.

Do infill units and subdivisions need detention in Whangarei?

Most do, unless the site drains straight to tidal water or the council waives it after an assessment. The engineering standards apply the 80 percent peak flow limit to development, and every new lot adds roof and paving. Bigger sites over half a hectare can be asked for a stormwater management plan, with the design certified by a qualified engineer.

What size detention tank do I need?

Whatever your design says, and on simple sites the council chart gives the figure. Whangarei's chart reads the tank volume and orifice size off the extra hard surface you add, assumes a round tank 3.5 metres across and kicks in at 30 square metres. It sizes on the safe side, so an engineer's design on a bigger site can trim the tank.

Can my rainwater tank be a detention tank as well?

Yes, if it is built as a combined tank. The bottom section stays full for household use and the top section is kept clear for storms, with the orifice set on the line between them. Auckland Council's tank guide describes a split of one third reuse and two thirds detention.

What is an orifice on a detention tank?

It is the small, sized hole that controls how fast the tank empties. It sits in a plate or cap on the outlet, and its diameter comes from the design, often only a couple of centimetres. Never drill it bigger or pull it out, because the tank then holds nothing back and the site no longer meets its consent.

Why is my detention tank always full?

Nearly always a blocked orifice or outlet pipe. Leaves, grit or slime close the hole, so the tank never drains and spills from the overflow in every shower. Look at the leaf guard and screen from the lid. If it is still full after a dry day, we clear the orifice and run a camera down the outlet line.

How often should a detention tank be cleaned?

Check it every year and clean it when silt builds up. Inspect the screens, orifice and filters yearly, and drain and clean the tank every two to three years. Trees over the roof or a gravel drive feeding the tank mean cleaning more often.

Does a detention tank need a building consent?

Yes, as a rule, because the tank and its pipes are drainage work. In Whangarei we show the tank, orifice and overflow on the building consent drawings for the house or development, with the sizing behind them.

Who is responsible for maintaining a detention tank?

The property owner. Whangarei's stormwater bylaw makes owners keep private stormwater systems working at their own cost, and a detention tank is part of that. On a rental it sits with the landlord. For a tank shared by several units, check the title.

Can I take out a detention tank I do not want?

Not without replacing it. Whangarei's standards make an owner put in another attenuation system before a reuse tank stops doing the job. Pulling one out also alters a stormwater system, which needs the council's written approval first.

Can a detention tank go under the driveway?

Yes, if the tank is rated for vehicles and buried with enough cover. It also needs hold down against groundwater lifting it, and risers so the orifice and silt can be reached. On land the council rates as a moderate or high stability hazard, the tank has to be sealed so stored water cannot soak into the slope.

Are Whangarei's detention rules the same as Auckland's?

No. In Auckland's stormwater flow areas, more than 50 square metres of new hard surface needs a resource consent, at least 5 mm of runoff retained, and detention that drains over 24 hours. Whangarei aims at peak flow instead, at 80 percent of the pre development peak. A tank designed for an Auckland section will not automatically suit one up here.

Can I install a detention tank myself?

Not the drainage part. Pipes into and out of the tank count as stormwater drains, and Whangarei's bylaw says private stormwater work is done by a licensed drainlayer. You can cut the bill by clearing the spot or relaying the garden afterwards.

What happens at the council inspection?

The inspector checks the tank, orifice, overflow and pipes against the approved plans before the trench is filled in. For a council stormwater connection, Whangarei wants 48 hours notice and an as built plan within a month. We book it, meet the inspector on site and draw the as built showing the tank, orifice size and overflow.

Got a detention condition on your consent?

Send the site plan and the engineer's design or the council's conditions. We check it and price it in writing.

Get help with stormwater detention tanks

Forms are picked up 24/7, nights and weekends too. Urgent? Call 09 885 5973.

We'll use your details to respond to your enquiry. Marketing messages are optional. Privacy Policy

Get my quoteGet a quote