New Build Drainage in Whangarei

We lay the sewer and stormwater drains to the boundary, set the levels before your slab goes in, test every run, book the council inspection and lodge the as built, with our in house certifying drainlayer and our own diggers. A new house, a granny flat or an extension in Whangarei all need that done in order.

On rural lots we add the septic or treatment plant, soak pits and detention tank. We work to your builder's programme and answer 24/7 if a site goes wrong.

  • Master Plumbers member logo

    Master Plumbers Member

  • Site Safe member logo

    Site Safe Member

  • Certifying Plumber, Certifying Gasfitter and Certifying Drainlayer

    Certifying Plumber, Gasfitter and Drainlayer

  • Google logo

    Google Rated 4.9

Get help with new build drainage

Forms are picked up 24/7, nights and weekends too. Urgent? Call 09 885 5973.

We'll use your details to respond to your enquiry. Marketing messages are optional. Privacy Policy

Overview & Answer

What drainage does a new house in Whangarei need?

Every new house needs a sewer drain and a stormwater system, laid by a licensed drainlayer to the consented plan. In town they run to the council connections at your boundary. Out of town the sewage goes to a septic tank or treatment plant, and roof water to tanks or soakage. Council inspects the drains on test before backfill.

Once it passes, the trenches are filled and council gets an as built plan showing exactly where the pipes went.

Trench or pipe trouble on site? Do this first

  1. Trench wall slumping

    Get everyone out and keep them back from the edge. Nobody climbs into a collapsed or unsupported trench to dig a person out. Call 111.

  2. Gas pipe, cable or unknown service hit

    Stop the digger and treat it as live. Gas smell: no flames or phones near it, move upwind, call 111, then Firstgas on 0800 802 332 or the number on the LPG bottle.

  3. Council pipe broken

    Burst water main or sewage spilling from a council line in the berm or street? Ring Whangarei District Council on 0800 932 463, which answers 24/7.

  4. Sewage in an open trench

    Keep kids and dogs away, wear gloves and boots, and wash your hands afterwards. Do not pump it onto the lawn or into a stormwater sump.

Call 09 885 5973

Scope & Inclusions

  • Sewer drains from the house to the boundary
  • Stormwater from downpipes, paths and driveways
  • Gully traps, vents and inspection points
  • Council drainage inspection booked and attended
  • As built plan signed by a certifying drainlayer
  • Septic tanks and treatment plants on rural lots

Need a different part of the build?

Triggers & Timing

Good times to get a drainlayer involved

The sooner we see the plans, the fewer surprises.

  • Plans being drawn

    We check the connection depths and falls before the floor level is set in stone.

  • Consent just granted

    Book the drains now. Good drainlayers fill up weeks ahead, and the slab will not wait.

  • Site cut finished

    The pad is down and the builder wants drains in before the boxing goes up.

  • The plan does not fit the ground

    The stub is shallower than drawn, or rock turns up where a pipe should go.

  • Rural lot, no services

    Septic, soakage and tank overflows all have to be planned around the house.

  • Drainlayer gone quiet

    We check and test what is already in the ground, then pick it up from there.

Drains & Systems

The drainage systems on a new build

Most houses need two or three of these. Your consented plan says which.

  • Sewer drain

    Takes toilets, showers, the kitchen and the laundry out to the council connection, through a gully trap and inspection points.

  • Stormwater drain

    Carries roof, path and driveway water to a council pipe, or to the kerb where council allows nothing better.

  • Soak pits

    Where there is no council stormwater, roof water soaks back into the ground, if a test shows the ground can take it.

    Soak pits
  • Detention tank

    Holds storm runoff from the new roof and paving, then lets it out slowly through a small outlet.

    Detention tanks
  • Septic or treatment plant

    Rural lots treat their own wastewater, to a design done for that site.

    Septic tanks
  • Pump chamber

    If the house sits below the sewer, a pump lifts the wastewater up to it.

    Pump stations

Proof & Promise

Why builders and owners call Taylor for new build drains

  • Certifying drainlayer

    Our in house certifying drainlayer signs every job off, and a new home build carries the Master Plumbers Guarantee: 12 months, up to $20,000 incl GST.

  • Levels checked before the slab

    We find the council stub, measure its depth and confirm the falls work before your designer or builder locks in the floor height.

  • Your programme, not ours

    We book the drains around the site cut, the slab pour and the scaffold, and confirm the day before we arrive.

  • Tested, photographed, then covered

    Every run is held on test for the council inspector and photographed before any fill goes back, and you get the photos.

  • One quote for the whole job

    Pipes, digging, spoil carted away, the septic or soak pits and the as built, priced together, with any live council tie in shown as its own line.

  • 24/7 when a site goes wrong

    A digger through a pipe or a new drain backing up gets a person on the phone and a crew out, day or night.

Plans & Consent

The drainage plan is part of your building consent

Your designer draws the drains on the consent plans: pipe routes, sizes, the gully trap, inspection points and where the sewer and stormwater end up. We lay to that plan, and the inspector checks against it.

Ground does not always match the drawing. If a pipe has to move, council approves the change before the trench is filled. In one Christchurch case, MBIE overturned a code compliance decision because a drain on a new house leaked.

Drainlaying, stormwater included, is restricted work. Only a licensed drainlayer, or someone supervised by a certifying drainlayer, may do it. Check any name on the public register.

Inspection & Approval

How WDC signs off the drains

Council inspects the drains uncovered and holding a test, and checks any council connection on the same visit. A connection inspection needs at least 48 hours notice, so we book early.

The drainlayer hands over the as built plan at that inspection, and ours carry a certifying drainlayer's registration number. For a new connection, council wants final as builts within a month of it going live.

Council & Connections

Who joins your drains to the council network

Your private drains stop at the boundary connection. Cutting into a live council sewer or stormwater main is a separate step that WDC keeps for contractors on its licensed list, and that firm must be named on the application.

With a stub at the boundary, we join to it under your building consent. Without one, we lodge the Public Utility application and book a licensed contractor for the tie in, inside our programme and our quote.

Levels & Falls

Why the floor height starts at the boundary

Drains only work downhill. A 100 mm house drain needs a fall of at least 1 in 60, about 17 mm for every metre, laid at an even grade all the way. Measure back from the depth of the council stub and you get the lowest your gully trap and floor can sit.

The gully trap rim has to sit at least 150 mm below the overflow of the lowest fixture, and above the ground around it: 25 mm over paving, 100 mm over lawn or garden. That way a blocked sewer spills outside, not into your shower.

Branch drains longer than 10 m need their own vent, so we flag those at plan stage.

Rain & Runoff

Where the roof water goes

On a serviced lot, stormwater goes to council's pipe through the boundary connection. Council treats a kerb outlet as a last resort. With no council pipe, it goes to soakage, which has to be proven by a test at that spot, above the winter water table.

A new roof and driveway shed water faster than bare ground. WDC asks anyone building to check whether that extra runoff must be held back, and its sizing chart starts at 30 m2 of new hard surface. We work through council's flowchart with you, or with your engineer where the consent calls for one.

Rural & Onsite

Septic and treatment plants on a new build

Off the sewer network, a suitably qualified designer assesses the soil and slope and designs the wastewater system to AS/NZS 1547, including a reserve area for a future field. That design goes in with your building consent, and Northland Regional Council's rules decide whether the discharge also needs a resource consent.

We install the tank or plant, the drain to it and the field, and keep roof water out of it. Choose early, as a treatment plant needs power and truck access for servicing.

Sequence & Coordination

Fitting the drains into the build

Most outside drains go in after the site cut, around the slab pour, before scaffold and the driveway block access. The plumber's under slab pipes meet ours at the foundation edge, so we agree those exit points together.

Every dig starts with a beforeUdig request, lodged two full business days out. Trenches over 1.5 m deep are shored, and notified to WorkSafe when the rules require it.

If a council pipe crosses the section, keep the house at least 2 m from it unless WDC agrees otherwise in writing before consent.

Process & Steps

From plans to as built

  1. 01

    Send the plans

    Consent drainage plan, site plan, address and where the build is at. Rural lots: the wastewater design too.

  2. 02

    Levels and price

    We locate the stub, check depths and falls, then give you a written price with GST and the council fees shown separately.

  3. 03

    Dig, lay, test

    Drains go in to your builder's dates, held on test, photographed and inspected by council before any backfill.

  4. 04

    As built and hand over

    Trenches filled, spoil gone, the as built signed and lodged, and a copy with photos sent to you.

Costs & Quotes

How new build drainage is priced

We price from your plans and a site look, in writing with GST. A flat town lot with stubs at the boundary is a short job; a sloping rural block with septic and rock is not.

The price moves with the length of pipe, the depth of the stub, rock or hard clay, the number of gully traps and inspection points, soakage or detention, a pump chamber, septic or a treatment plant, the licensed tie in, reinstatement and travel.

Consent fees, connection fees and development contributions are council charges, listed on their own lines. Once the levels are confirmed the price is fixed in writing.

Request a quote

Whangarei & Northland

New build drainage around Whangarei

Whangarei District Council consents and inspects the drains, and runs the sewer and stormwater networks your house joins. Ground changes fast here: hard rock in parts of town, heavy clay on the hills, sand at Ruakaka and Mangawhai. Wastewater capacity is tight in Ruakaka and parts of Whangarei Heads, so check before you lodge plans there.

Based in Whangarei, we lay drains from Kamo to Waipu and across Northland, Kaitaia to Mangawhai, with travel outside the district quoted first and an honest arrival time further out. We follow Far North and Kaipara drainage rules there. From 1 July 2027 Northland Waters is due to run the sewer side, while stormwater stays with council.

WDC sewer connection steps

Clients & Sectors

Builders, owner builders and families adding a dwelling

  • Builders and group builders

    We work to your site rules and dates, and send the photos and as built straight to your site manager.

  • Owner builders

    We tell you what must be ready before we arrive and who books which inspection.

  • Granny flats and minor dwellings

    The levels decide whether it joins your drains or needs its own.

  • Extensions

    New drains tie into the old ones, which we film first if they look tired.

Related & Similar

Related drainage and build services

Plumbing inside the house, council connections, stormwater and rural wastewater each have their own page.

View all drainlaying services

Questions & Answers

New build drainage questions

How much does drainage for a new house cost in Whangarei?

The section sets the price more than the house. Pipe length, stub depth, rock, stormwater disposal and any septic or pump swing it. Send the plans for a written price with GST and council fees shown separately.

When does the drainlayer start on a new build?

Usually straight after the site cut, around the time the slab goes in. Book us before that, because the levels we take decide how low the floor can sit. The drains then stay open until council has inspected them.

Do I need a plumber or a drainlayer for a new house?

Both. The plumber does the pipes inside and under the house. The drainlayer takes over at the foundation and lays everything outside. We have both trades on one team, so the hand over point is agreed before anything is dug.

What if the drainage plan does not suit the site?

We raise it before we dig. A shallow stub, rock or a changed floor height can force a new route. Council must accept the change before the drain is covered, so we sort it with your designer first.

What fall does a house drain need in New Zealand?

Under the Building Code's acceptable solution, at least 1 in 60 for a 100 mm drain, which is about 17 mm of drop per metre. Smaller pipes need steeper falls, such as 1 in 40 for 65 mm. The fall has to be even, with no dips where waste can settle.

How high does a gully trap need to be?

Its rim must be at least 25 mm above paving or 100 mm above lawn and garden, and at least 150 mm below the overflow of the lowest fixture inside. It must be inside your boundary, with surface water kept out, so a backed up sewer overflows outdoors.

What does council check at the drainage inspection?

The inspector looks at the pipes before they are covered, with the drains holding a test, and checks them against your consented plan. If you are joining the council network, the connection is inspected too. The drainlayer hands in the as built plan at the same visit.

Who signs the as built drainage plan in Whangarei?

The owner, a certifying plumber or a certifying drainlayer can sign WDC's as built form, which records where the drains actually went, with pipe sizes and connections. Ours are signed by a certifying drainlayer, and your copy saves digging blind later.

Can you connect my new house to the council sewer?

Yes. We lay and test the private drain and join it to the boundary stub under your building consent. Any cut into a live council main is done by a contractor from WDC's licensed list, booked through us and shown on our quote.

How do I find the drain connection on my section?

Start with council. WDC's online assets map shows its pipes, and it can send the as built for your connection within about 10 working days. On site we confirm the stub by probing or hand digging before the floor level is set.

Do I need a stormwater detention tank for a new house in Whangarei?

Only if WDC's runoff check says so. Every project checks whether the extra runoff from the new roof and paving must be held back. Its flowchart and sizing chart work it out, and sites draining straight to tidal water are usually exempt. Your consent conditions may already say.

Can the roof water go into a soak pit?

Yes, where there is no council stormwater and the ground passes a soakage test at that spot. The pit must sit above the winter water table, and clay often fails the test, which can push you to tanks or a bigger pit.

What does a rural new build need for wastewater?

A septic tank or treatment plant and a disposal field, designed for your site by a suitably qualified designer. The design goes with your building consent, and Northland Regional Council's rules decide if you also need a resource consent. We install it to the design.

Does a granny flat need its own drains?

Not always. It can often branch off your existing drains, if the levels and pipe size allow. Under the 70 square metre exemption there is no consent, but WDC still wants a record of the drainlaying once it is done, so use a licensed drainlayer and keep the paperwork.

Does council always inspect new house drains?

No. Under MBIE's self certification scheme, an endorsed drainlayer can certify eligible consented work on buildings up to three storeys, and council then does not inspect it. You get a certificate of compliance within 10 working days. Drains serving public infrastructure are excluded.

Drains for your new build in Whangarei

Send the drainage plan and tell us where the build is at. We check the levels, give you a fixed written price and fit the drains to your builder's dates.

Get help with new build drainage

Forms are picked up 24/7, nights and weekends too. Urgent? Call 09 885 5973.

We'll use your details to respond to your enquiry. Marketing messages are optional. Privacy Policy

Get my quoteGet a quote