Our plumbers, gasfitter and drainlayer do every wet trade on a new home: under slab, rough in, fit off, hot water, gas, drains, water supply and the sign off paperwork. Building in Whangarei or further out in Northland, it is the same team on the job.

We work for builders, group home builders, owner builders and developers, and we book our visits around your programme. 35 years in the trade, an in house certifying plumber for every sign off, and the Master Plumbers Guarantee standing behind home workmanship, up to $20,000 including GST.

  • Master Plumbers member logo

    Master Plumbers Member

  • Site Safe member logo

    Site Safe Member

  • Certifying Plumber, Certifying Gasfitter and Certifying Drainlayer

    Certifying Plumber, Gasfitter and Drainlayer

  • Google logo

    Google Rated 4.9

Get help with new build plumbing

Forms are picked up 24/7, nights and weekends too. Urgent? Call 09 885 5973.

We'll use your details to respond to your enquiry. Marketing messages are optional. Privacy Policy

Overview & Answer

What does a plumber do on a new build?

A new build plumber installs the water, waste and hot water pipes in three main visits: under slab before the concrete goes in, rough in while the framing is open, and fit off once linings and finishes are done. Each stage is tested before it gets covered, and Whangarei District Council inspects at set points along the way.

Around that sit the gas pipe, the drains, the council water or tank supply, and the certificates for your code compliance certificate. We cover all of it, so one company answers for everything wet on your build.

Pipe or service hit on site? Do this first

  1. Water pouring from a cut pipe

    Close the valve in the meter box at the boundary, or switch the pump off on a tank site. Council pipe in the street or berm? Ring WDC on 0800 932 463, any hour.

  2. Gas pipe hit or gas smell

    Stop the machines, no flames, no phones near the smell. Move everyone upwind, call 111 from a safe distance, then Firstgas on 0800 802 332, or the number on the LPG bottle.

  3. Cable or unknown pipe

    Treat it as live. Keep people and the digger clear and call 111 if anyone is hurt.

  4. Water through a finished house

    Shut the water at the boundary and switch the cylinder off from a dry spot. Ring us and your builder, and take photos for the insurer.

Call 09 885 5973

Scope & Inclusions

  • Plan review and fixture set outs
  • Rough in of water, waste and vent pipes
  • Hot water cylinders, heat pump water heaters and gas califonts
  • Drains to the boundary, sewer or septic tank
  • Fit off of tapware, toilets, showers and appliances
  • Producer statements, gas certificates and as built plans

Looking for one part of the job?

Triggers & Timing

The right time to ring us

Earlier is cheaper. These are the usual points.

  • Plans still on the drawing board

    We spot a long hot water run or a toilet with no room for fall before council sees the plans.

  • Slab booked

    Under slab wastes must be in, tested and passed before the concrete truck turns up.

  • Frame up and roof on

    Rough in time. We need the final tapware and toilet models now.

  • Your plumber has pulled out

    We check and test what is already in, then carry on from there.

  • Rural section, no town water

    Tank, pump and wastewater get planned with the house.

  • A leak after you move in

    Put it in writing to your builder, or to us if you hired us.

Stages & Timing

Under slab, rough in and fit off

Most new homes get three main plumbing visits, then commissioning and hand over.

  • Under slab

    Wastes for the toilets, showers, basins and kitchen are laid to the plan, set to fall and left full of water for council's check. Water pipes through concrete go in sleeves.

  • Rough in

    With the frame up, we run hot and cold, waste, vent and gas pipes, fix the mixer bodies and hold everything under pressure for the pre line inspection.

  • Fit off

    After linings, tiling and cabinetry, we fit tapware, toilets, basins, showers, the sink and appliance connections, then start the hot water.

  • Commission and hand over

    We flush the lines, check flow, tap temperature and every joint, then hand over the paperwork.

Proof & Promise

Why builders and owners use Taylor on new builds

  • Every wet trade under one roof

    A certifying plumber, gasfitter and drainlayer in house, and we are Master Plumbers members. 35 years in the trade, with the Master Plumbers Guarantee standing behind home workmanship: 12 months, up to $20,000 including GST. There is a lifetime guarantee on our plumbing labour, and the maker's warranty on parts.

  • We turn up when the programme says

    Stage dates are locked in with your site manager at the start, and we confirm the day before each visit.

  • Tested and photographed before cover

    Every pipe run is pressure tested and photographed before linings, and you get the photos.

  • Set up for group builders

    We work to your set out sheets, subcontract terms, site rules and claim cycle, with insurance certificates on file.

  • 24/7 when a site needs it

    A pipe cut by a digger or a leak at fit off goes to our 24/7 roster, with an arrival time for the site given before we set off.

  • Paperwork that does not hold up your CCC

    Producer statements, gas certificates and warranty registrations arrive at hand over, not weeks later.

Council & Inspections

What WDC checks on the plumbing

WDC lists the inspections a typical house needs, and four of them involve our work. Under slab plumbing is checked for layout, materials and fall while the pipes hold water. At pre line, the hot and cold pipes are inspected under pressure. Drains are inspected before trenches are backfilled, and the final checks hot water temperature and collects the paperwork.

The consented plans must be on site. Missing paperwork fails the inspection and rebooking costs extra. A national target now has councils completing at least 80 percent of inspections within three working days of the date asked for, and we still book ahead.

Records & Certificates

Producer statements, records of work and as builts

Records of work come from Licensed Building Practitioners, usually your builder and designer. Plumbing is not restricted building work, so plumbers are not LBPs. From us you get producer statements for the water pressure test and the drain test on WDC's own PS3 forms, plus the gas certificates.

The drainlayer gives council a drainage as built plan at the drainage inspection.

You apply for the code compliance certificate when the work is finished, and WDC has 20 working days to decide once it has everything. If nobody applies within 24 months of consent, council must decide anyway, so ask for an extension on a long build.

Defects & Warranties

What the Building Act gives you after hand over

Every home build carries implied warranties under the Building Act: work done to the consented plans, with suitable materials, to the Building Code, with reasonable care and in a reasonable time. They last up to 10 years, written contract or not.

The first 12 months after completion are a defect repair period. On a builder led job you notify the main contractor in writing, and they organise the fix even when a subcontractor caused it.

At completion the contractor must hand over insurance on the work, product warranties and maintenance information. Ours come with cylinder and tapware warranties already registered.

Cylinders & Sizing

Choosing and sizing the hot water

Settle the system before rough in. A heat pump, a gas califont and an electric cylinder each need different pipes, power and floor space. Put it near the bathrooms and kitchen so hot water arrives quickly and less heat is lost in the pipes.

Stored water is kept at 60°C or more to control legionella, while new bathroom fixtures in a home get water no hotter than 50°C. We fit a tempering valve wherever the system needs one.

Water & Drains

Getting connected to council services

Most Whangarei sections had a water connection point left at the boundary at subdivision. Council can hold the approval letter until development contributions are paid, and only a contractor on WDC's licensed list may connect to a live main or fit the meter.

Council's standard is a 20 mm connection with at least 250 kPa at the boundary on existing residential lots. A house that also has a tank, pool, spa or irrigation needs a testable backflow device at the boundary.

New building must stay 2 m from a public sewer unless WDC agrees in writing before consent. Wastewater capacity is being managed in Ruakaka and parts of Whangarei Heads, so check early there.

Pipework & Timing

Gas goes in with the frame

Gas pipe to a hob, califont or fire goes in at rough in alongside the water pipes. Decide early between piped natural gas and LPG bottles, and where the meter or bottles sit, because the gas truck needs a clear path.

Firstgas quotes 6 to 8 weeks as its standard time for a new connection, and you usually supply the trench, so apply once consent is through. Once connected you get a gas safety certificate within 20 working days and a certificate of compliance.

Rural & Builds

Tank water, pumps and septic out of town

Off the council network, the roof feeds a tank, a pump pushes water to the house and treatment makes it safe to drink. A household supply serving 25 people or fewer does not register with Taumata Arowai, so getting it right falls to you and your plumber.

Drinking water tanks must meet AS/NZS 4020. Where your consent asks for firefighting water, SNZ PAS 4509 sets the amount, on top of household storage. We plan the tank, pump, filters, UV and wastewater system with the house.

Process & Steps

From plans to hand over

  1. 01

    Send us the plans

    Plans, fixture schedule, address and where the build is at.

  2. 02

    Written quote by stage

    Priced stage by stage, GST included, naming the plan version and what is left out.

  3. 03

    Stages to your programme

    Dates agreed with the site manager, each stage tested, inspections booked or confirmed and photos sent.

  4. 04

    Fit off and hand over

    Everything commissioned and checked, with producer statements, certificates, manuals and warranties in one pack.

Costs & Quotes

How new build plumbing is priced

There is no set price for a new house. A one bathroom cottage on town water and a two storey home on tank water with a heat pump are very different jobs, so we price from your plans and fixture schedule.

The quote breaks out each stage, the hot water, gas, drains, the water connection or tank supply, any fixtures we supply, testing, paperwork, travel and GST. Allowances are marked as allowances.

Bathrooms and storeys, long pipe runs, gas, pumps and treatment, distance, extra visits when a stage is not ready and plan changes after rough in all move the price. Council fees, contributions and Firstgas's charge are set by others. Changes are priced and agreed in writing first.

If you hire us directly for residential building work of $30,000 or more including GST, the law requires a written contract, and you get a disclosure statement and checklist before you sign. On a builder led job we are usually the builder's subcontractor, named in the builder's contract with you.

Request a quote

Whangarei & Northland

New builds around Whangarei

In the Whangarei district, WDC runs building consents, inspections and the council water and wastewater networks today. Water services move to Northland Waters, a council owned company for Whangarei, Kaipara and the Far North, from 1 July 2027, so connection steps may change.

Ruakaka, Marsden Cove, Kamo and Whangarei Heads each bring their own mix of town water, tanks and wastewater limits. Whangarei is home base, and we cover all of Northland, from Kaitaia, Kerikeri and the Bay of Islands to Dargaville and Mangawhai, with any travel outside the Whangarei district quoted before we book, and further afield you get a real arrival time when you ring.

Areas we cover

Clients & Sectors

Builders, owner builders and developers

  • Builders

    We work to your programme and site rules and keep our side of the inspection diary.

  • Group home builders

    Standard plans mean repeatable pricing across several sites at once.

  • Owner builders

    You carry the coordination a builder normally does. We spell out what must be ready before each visit and which inspections are ours to book.

  • Developers

    Townhouses and subdivisions need plumbing and connections lined up with the civil works. We price per unit and stage.

Related & Similar

Related new build services

Drains, hot water, gas and rural water each have their own page.

View all plumbing services

Questions & Answers

New build plumbing questions

How much does new build plumbing cost in Whangarei?

There is no set price, so send the plans and fixture schedule for a stage by stage price, GST included. A one bathroom home on town water costs far less than a two storey house with gas and a tank.

When should a plumber be brought into a new build?

Before the plans go in for consent, ideally. That is when moving a bathroom or grouping wet areas costs nothing. At the latest, book us before the slab, since under slab wastes go in, get tested and get inspected before the pour.

What is the difference between rough in and fit off?

Rough in is the pipework fitted while the walls are open, and fit off is fitting taps, toilets and fixtures once the walls are finished. Rough in is pressure tested and inspected before linings. Fit off comes after tiling, paint and cabinetry.

What plumbing inspections does Whangarei District Council do on a new house?

Usually four: under slab plumbing, pre line with the pipes under pressure, drainage before backfill, and the final. Your consent sets the exact list. A timber floored house has no under slab check, and eligible work self certified by an endorsed plumber under the national scheme can skip the council inspection.

Who books the council inspections on a new build?

We do. We book every plumbing, gas and drainage inspection with WDC a day or two ahead, with the consent number, address and a site contact, and line the dates up with your builder at the start.

What plumbing paperwork is needed for the code compliance certificate?

Producer statements for the water and drain tests, gas certificates and the drainage as built plan. WDC collects these, with the electrical certificates, at the final.

Does the plumber give a record of work?

Not on a consented house. Records of work come from Licensed Building Practitioners doing restricted building work, and plumbing is not restricted building work. The exception is a granny flat built under the exemption, where WDC asks for a record of the sanitary plumbing and drainlaying when it is finished.

What size hot water cylinder does a new home need?

Size it from the people and outlets, not the floor area. EECA's guide puts daily hot water use at about 100 litres for a two bedroom home, rising to about 300 litres for six. Heat pumps and califonts size differently, so we run the numbers with you.

What happens if the plumbing fails a council inspection?

The inspector lists what needs fixing, the work is put right, and the inspection is booked again, which costs extra. Missing paperwork or plans not on site are the usual trip ups, so we have both ready.

Can you plumb a new home on tank water?

Yes. We plan the tank, pump, filters and UV with the house. If the section also has council water, the two are kept apart with an air gap or a testable backflow device, so tank water can never flow back into the public supply.

Do you work with owner builders?

Yes, and we do more of the coordinating on those jobs. We tell you what must be ready before each visit, book the inspections and list the paperwork the code compliance certificate needs.

Can I supply my own tapware and fixtures?

Yes, if we know the exact models before rough in. Concealed mixers and in wall cisterns set pipe positions, so a late swap can mean opening a wall.

Who fixes a plumbing defect after we move in?

Your builder if they hired us, or us if you hired us directly. Report it in writing within 12 months of completion and it must be fixed within a reasonable time.

Do you do the gas and drains on a new build too?

Yes. Our gasfitters lay and certify the gas pipe, and our drainlayers lay and test the drains out to the boundary or the septic system. The live connection to a council main must be made by a contractor on WDC's licensed list, and our quote shows who does that step.

Can you plumb a granny flat under the 70 square metre exemption?

Yes. Since 15 January 2026, a single storey standalone home of up to 70 square metres can skip consent if every condition is met and WDC has issued a project information memorandum. A level entry shower needing a membrane rules it out, and council does not inspect.

Plumbing for your new build in Whangarei

Send the plans and tell us where the build is at. We come back with a stage by stage price and dates that fit your builder's programme.

Get help with new build plumbing

Forms are picked up 24/7, nights and weekends too. Urgent? Call 09 885 5973.

We'll use your details to respond to your enquiry. Marketing messages are optional. Privacy Policy

Get my quoteGet a quote