Taylor Plumbing Whangarei logo

Septic & Wastewater

Septic Tank Installation in Whangarei

We arrange the design, lodge the consents and install septic tanks, aerated and other secondary treatment systems and disposal fields across Whangarei and Northland, for new builds and replacements, with our in house certifying drainlayer and our own diggers. Building on a section with no sewer, or replacing an old field that has given up, both start with the ground.

We arrange the soil assessment, handle the council paperwork, do the dig and hand over a system that suits your ground and your household.

  • Master Plumbers member logo

    Master Plumbers Member

  • Site Safe member logo

    Site Safe Member

  • Certifying Plumber, Certifying Gasfitter and Certifying Drainlayer

    Certifying Plumber, Gasfitter and Drainlayer

  • Google logo

    Google Rated 4.9

Get help with septic installation

Forms are picked up 24/7, nights and weekends too. Urgent? Call 09 885 5973.

We'll use your details to respond to your enquiry. Marketing messages are optional. Privacy Policy

Overview & Answer

Do I need consent to install a septic tank in Whangarei?

Yes. A new system, or a replacement for a failed one, needs a building consent from your district council: Whangarei, Far North or Kaipara. Northland Regional Council controls the discharge to land, allowed without a resource consent only when the design meets its Regional Plan rules. A certifying drainlayer must do or supervise the work.

The design comes first. A site and soil assessment to AS/NZS 1547:2012 shows what your ground can take, which decides the tank, the treatment level and the field. We run all three approvals as one job.

Sewage on the ground or an alarm going? Do this first

  1. Effluent surfacing outside

    Keep children and pets off the wet ground and away from any open pipe. Cut water use right down: no washing machine, no long showers. Wear gloves and boots if you have to go near it, then wash your hands well.

  2. Treatment plant alarm

    Find the plant's breaker at your switchboard and reset it once. If it trips again or the alarm carries on, leave it and call your service agent or us. The mute button only silences the noise.

  3. Sewage backing up inside

    Stop running water and keep everyone out of that room. Do not flush toilets until the cause is found, whether it is the pipe, the tank or the field.

  4. Lids and covers

    Leave tank lids and plant covers on. Only a service agent should open them, and nobody should lean into or climb inside a tank.

Call 09 885 5973

Scope & Inclusions

  • New septic tank installs for new builds
  • Aerated and secondary treatment systems (AWTS)
  • Passive and worm based systems with no power
  • Trenches, beds, mounds and drip irrigation
  • Wastewater design reports for consent
  • Replacing failed tanks and disposal fields

Need something else?

Triggers & Timing

Septic jobs we get called for

Most calls start with a new section, a failing field or a bigger household.

  • Building where there is no sewer

    The septic design goes in with your building consent, so start it alongside the house plans.

  • Wet, smelly ground over the field

    Spongy ground, bright green grass or dark liquid seeping from the trenches means the field has stopped soaking it away.

  • Adding a sleepout or minor dwelling

    More people means more wastewater, so the existing system needs checking for the extra load.

  • Buying a rural property

    Ask the seller for the consent records and servicing history, and get the system checked before you go unconditional.

Paths & Options

Septic tank or secondary treatment

Treatment level and disposal method are two choices, and your site decides both.

  • Septic tank (primary)

    Solids settle and start breaking down in the tank, then the liquid runs to trenches or beds where the soil finishes the job. It needs free draining ground and room, but no power.

  • Aerated treatment plant (AWTS)

    Air pumped through extra chambers treats effluent to a secondary standard so it can go out through drip lines. It suits tight, wet, sloping or sensitive sites, but needs power at all times and regular servicing.

  • Passive secondary systems

    Some worm based and bed systems treat to a secondary standard by gravity, with no power at all. Handy where outages are common, though worm systems can ask more of the owner.

  • The disposal field

    Septic effluent goes to trenches or beds. Secondary effluent usually goes to drip lines 100 to 150 mm down or under mulch. A sand mound lifts the field where the ground is wet or shallow.

Proof & Promise

Why call Taylor about a septic system?

  • Certifying drainlayer

    Our in house certifying drainlayer runs every septic install and signs it off. Home work carries the Master Plumbers Guarantee: 12 months, up to $20,000 incl GST.

  • Design and consents handled

    The wastewater designer we brief does the site and soil assessment and design report, and we lodge the building consent and any Regional Council consent.

  • Every kind of system

    Concrete and plastic septic tanks, aerated plants, passive and worm systems, drip lines and mounds, supplied and installed.

  • Our own diggers and crew

    We dig, lay, connect and reinstate with our own gear, so the house drains, tank, field and power trench are one team's work.

  • 24/7 when a system fails

    Effluent on the lawn or an alarm that will not stop gets a real person on the phone, day or night.

  • Paperwork you can find later

    A written quote with GST shown, then the as built plan, producer statement, manuals and servicing details before we leave.

Consents & Inspections

Three approvals on one job

Your district council issues the building consent and inspects the work: Whangarei District Council here, the Far North council to the north, and Kaipara around Dargaville and Mangawhai. Building Code clause G13 covers on site disposal, and a design to AS/NZS 1547:2012 is a recognised way to comply.

Northland Regional Council controls the discharge to land. Its Regional Plan, operative since 27 March 2026, permits a household system that meets its rule on design, setbacks, slope, flooding and reserve area. Anything outside those conditions needs a resource consent, and Whangarei council wants that settled before the building consent goes in.

The drains, tank connections and field are restricted drainlaying, so a certifying drainlayer does or supervises them. Check any name on the PGDB public register.

Soil & Slope

What the designer looks for

Test pits go at least 2 metres below where the field will sit. The designer logs the soil, estimates how high the water table rises in winter and, for trenches in slower soils, runs soakage tests. The soil gets a category from one to seven, which sets how much effluent each square metre can take.

They also map streams, bores, boundaries, banks, buildings and the coast, and Whangarei council keeps map layers for effluent suitability and slope stability. Where a resource consent is needed, Northland Regional Council asks for written approval from owners of bores within 20 metres of the field.

Sizing & Capacity

How big it needs to be

Size starts with how many people the house can sleep and where your water comes from. Northland Regional Council's consent guide allows 140 litres a person a day on roof water and 180 on bore or town supply.

The tank holds the solids, but the field does the real work. Heavy clay needs a far bigger field than free draining loam for the same house.

Failure & Replacement

When the old system gives up

Fields fail from age, roots, stormwater in the trenches, too many people or a tank left too long between pump outs. We find which part failed first. Sometimes a pump out, an outlet filter and moving the stormwater away buys real time.

If the field is finished, the new one has to meet today's rules, which can mean secondary treatment where the old house got by with a septic tank. That replacement needs a building consent like any new install. We pump out and decommission the old tank so it cannot collapse or fill with water later.

Environment & Setbacks

Near the coast, streams and wetlands

The Regional Plan rule keeps fields set back from the coast, streams, lakes, wetlands, groundwater and boundaries, and limits them in flood zones and on steep slopes. Sandy coastal ground drains fast, but shallow groundwater underneath can take effluent before the soil has treated it.

On those sites, and on small sections, the usual answer is secondary treatment with drip lines and planting. A sloping field gets a planted buffer below the lowest drip line so nothing runs off in heavy rain.

Process & Steps

From test pit to sign off

  1. 01

    Tell us about the site

    The address, plans or bedroom count, water supply and any existing system. Not bought yet? We can look first.

  2. 02

    Assessment and design

    Test pits, soil category and a site map, then a design report showing the system, the field and the reserve area.

  3. 03

    Consents and written quote

    We lodge the building consent and any Regional Council application and price the whole job in writing, GST shown.

  4. 04

    Install, inspect, hand over

    We set the tank, lay the field, book the council inspections and leave you the as built plan, manuals and servicing details.

Costs & Quotes

How septic installation is priced

We price yours in writing once the site assessment shows what the ground needs. A septic tank on free draining flat ground and an aerated plant with drip lines on steep clay are very different jobs.

Our quote lists the site assessment and design, council and Regional Council fees, the tank or plant with its pumps and alarm, the field and reserve area, drains from the house, excavation and reinstatement, power to the plant, decommissioning any old tank, travel and GST.

Soil and slope move the price most. Clay, rock, high groundwater, a long run from the house, a pump to push effluent uphill, tight digger access and a sensitive site that needs secondary treatment all add cost. Servicing and power carry on after the install.

Nothing outside the quote goes ahead without your yes.

Request a quote

Whangarei & Northland

Septic work around Northland

Most rural Northland homes run on a septic tank or treatment plant, and the paperwork changes at council boundaries, with Northland Regional Council setting the discharge rules across all three districts. Whangarei council maintains the tanks in the Onerahi effluent scheme itself, and in Mangawhai any property off the council scheme needs its own system.

We work across Whangarei and its rural edges, from Maungatapere and Kamo to Parua Bay, Whangarei Heads, Ruakaka and Waipu. We are Whangarei based and cover all Northland: Kaitaia, Kerikeri, the Bay of Islands, Dargaville and Mangawhai. Out of town travel is quoted before we set off.

Whangarei council wastewater information

Customers & Properties

Builders, lifestyle blocks, baches and landlords

  • New builds and builders

    We work to your build programme and coordinate the house drains, tank and field with your builder and engineer.

  • Lifestyle block owners

    We get the system sized for the household you expect in ten years, with room for a minor dwelling.

  • Baches and holiday homes

    A full house at Christmas needs a system sized for the peak. We can meet a caretaker and send photos while you are away.

  • Landlords and rental owners

    We leave the records and servicing schedule the council expects, and work around your tenants.

Related & Similar

Related wastewater and drainage services

Servicing, sewer, pumps and drains each have their own page.

View all drainlaying services

Questions & Answers

Septic installation questions

How much does it cost to install a septic system in Whangarei?

It comes down mostly to your soil, your slope and whether the site needs secondary treatment. A septic tank with trenches on free draining ground costs far less than an aerated plant with drip lines on steep clay. We give you a written price once the site is assessed, so you can compare like with like.

Do I need resource consent from Northland Regional Council?

Not if your design meets the Regional Plan's permitted rule for household wastewater, which covers flows from a normal home, design to AS/NZS 1547:2012, distances from water, the coast and boundaries, slope and flooding. Bigger flows or tight sites need a resource consent, which adds time and, in Whangarei, must be sorted before the building consent is lodged.

What is the difference between a septic tank and an AWTS?

A septic tank gives primary treatment: solids settle out and the soil finishes treating the liquid. An aerated wastewater treatment system adds air and extra chambers to treat effluent to a secondary standard first, so it can go to shallow drip lines on a smaller area. The trade off is power, an alarm and regular servicing.

Does my property need secondary treatment?

Only if your site or the rules call for it. Small sections, heavy clay, high winter groundwater, steep ground and land near streams, wetlands or the coast often do. A large, free draining section may suit a septic tank and trenches. The site assessment shows which, and the Regional Plan conditions confirm it.

What size septic tank do I need?

Often 4,500 litres in two chambers, which is where the Far North council's design form starts unless the designer justifies another size. Your designer sets the final size from how many people the house can sleep and your water supply, and the field size follows from the daily flow and your soil.

Who can design a septic system in Northland?

A qualified designer, and each council sets its own bar. Whangarei wants a suitably qualified and experienced person to assess the site to AS/NZS 1547:2012. Far North accepts a registered engineer, a certifying drainlayer or someone who has passed its approved course. Kaipara asks for a suitably qualified person, or a Chartered Professional Engineer where a consent notice requires one.

How long does a septic installation take?

The install itself is usually a few days on site. Most of the time goes before that: the site assessment, the design and council processing, and longer again if a resource consent is needed. Building a house? Start the septic design with the house plans so it does not hold up your consent.

Can I replace my old septic tank like for like?

Only for a working system. Repairing or swapping a part can be done without a consent when an authorised person does it and it meets the Building Code. Replacing a failed field or the whole system is treated as a new install, with a fresh design to today's rules. We check what your job needs before quoting.

How do I know my disposal field has failed?

Spongy ground over the field, unusually green grass, dark liquid seeping out, sewage smells and slow drains right through the house are the classic signs. An overdue tank can cause the same symptoms, so a pump out and inspection come first. If the field is finished, it needs replacing.

Do aerated septic systems need power?

Yes, all the time. With the power off an aerated plant does no treatment and its alarm stays silent, and Northland Regional Council says to leave it switched on even when the bach is empty. If outages are common where you live, ask us about a passive system that runs by gravity.

What is a reserve area for a septic field?

It is a second patch of suitable ground kept free for a new field if the first one fails. It is drawn on the consent plans, so keep it clear of buildings, driveways and big trees. How large it must be depends on the treatment level and the council; on one recent Far North consent it was about 30 percent of the main field.

Can I drive, build or grow vegetables on the disposal field?

No to vehicles and buildings, because weight crushes the pipes and packs down the soil. BRANZ advises against food crops on land taking primary effluent, and even treated effluent carries germs, so wear gloves when working near the lines.

Do I need a maintenance contract for my septic system?

For most treatment plants, yes. Whangarei council says proprietary systems need a maintenance contract with the maker's approved service agent, and makers often tie the warranty to six monthly servicing. Plain septic tanks still need checks and pump outs every few years.

Can I connect a sleepout or minor dwelling to my existing septic?

Only if the system has room for the extra people, so it needs checking first. MBIE's exempt building guidance says a sleepout draining to the house's septic system needs that capacity check. A minor dwelling normally needs a building consent, and the design may call for a bigger field or an upgrade to secondary treatment.

Do you come out after hours when a septic system fails?

Yes. We do 24/7 call outs when sewage surfaces, backs up inside or an alarm will not stop, and you talk to a person. We make it safe, find out whether the pipe, the tank or the field is the problem, and tell you the after hours cost before we head out.

Plan your septic system in Whangarei

Send the address and your house plans or bedroom count for the next steps and a written price once the site is assessed.

Get help with septic installation

Forms are picked up 24/7, nights and weekends too. Urgent? Call 09 885 5973.

We'll use your details to respond to your enquiry. Marketing messages are optional. Privacy Policy

Get my quoteGet a quote